Quick Answer

Yes. The center pier between the two openings comes out, an engineered header spans the full 16 to 18 feet, and a single double door goes in. Because the pier usually carries roof load, the project needs engineering, a permit, and a framing crew alongside the door installer. The all-in budget depends on span, roof load, and the door you choose; Affordable Door Co gives free, no-pressure estimates at (405) 247-0336.

Why people do it, and why it is bigger than it looks

The motivation is almost always the same: the center pier makes parking two modern vehicles a mirror-folding ritual. Crew-cab pickups and three-row SUVs simply outgrew the twin 8-foot openings that were standard on metro homes through the 90s. Removing the pier turns two tight bays into one generous one.

The catch is that the pier is rarely decorative. On most gable-front garages it carries a point load from the roof structure down to the footing. Take it out casually and the header above sags within a season, which shows up as a door that rubs the header in the middle, cracking brick above the opening, and eventually a roofline dip you can see from the curb. So the sequence is strict: engineer sizes the new beam, framer shores the roof and sets the header across the full span, then we hang the door.

The project, step by step

  • Engineering letter: the smallest line item, but non-negotiable. It sizes the LVL or steel beam for your span and roof load, and metro permit offices want this on file for a 16-foot-plus opening.
  • Demolition and framing: the largest share of the project. Shoring, pier removal, beam installation, new jack studs and jambs, plus brick or siding repair where the pier stood. Brick veneer homes also need a continuous steel lintel.
  • The new door: installed cost scales with construction, from a plain pan door to an insulated carriage-style CHI with windows. Wide doors need a proper strut package in our wind zone, which is exactly the topic of the 16-foot strut answer, and the tracks, springs, and hardware all come new with the installation.
  • Opener consolidation. Two old openers become one unit rated for the heavier door, ideally a belt drive or wall-mount. One less motor to maintain, one less remote on the visor.

Questions worth settling before you commit

  • Resale taste is regional. In most OKC neighborhoods a double door reads as an upgrade. In a few historic districts like Mesta Park, exterior changes need commission review; check before designing.
  • Do you lose storage? The pier often hides a stub wall with shelving or the shop-vac outlet. Plan where that goes.
  • Could framing money serve you better? If the real problem is one narrow bay, widening a single opening, as covered in the widening answer, costs less than a full combination.

We play the door position on these projects constantly and can coordinate directly with your framer so the opening is never left unsecured overnight. Estimates are free, and financing can wrap the door portion into payments while the framing settles on its own contract.

One Big Door, Done Right

Talk to a real OKC technician — 24/7, no after-hours surcharge, free estimates.

Related Questions

How long does it take to get a garage door after ordering it?+

Stock sizes and colors install within about a week. Custom factory orders run two to six weeks depending on brand, options, and season. Wide custom doors for combination projects should be ordered before framing begins. Read the full answer →

Should I replace my builder-grade garage door?+

Usually yes once it passes 15 years. Builder doors are thin, uninsulated, and sprung with minimum-cycle hardware, and a quality replacement recoups an outsized share of its cost at resale while cutting noise and drafts. Read the full answer →

How long does it take to install a new garage door?+

Three to five hours for a standard replacement, longer with framing repairs or a simultaneous opener install. Combination projects take a day or two of framing before the door phase even starts. Read the full answer →

Found this helpful? Share it.

Send it to a neighbor, or save it for later.

Facebook X LinkedIn Email

Follow Affordable Door Co on Facebook for seasonal garage door tips and local project photos. Still stuck? Contact us.

Keep Reading

Related answers

Serving OKC Metro Cities & Nearby Communities

We provide garage door repair services across the entire Oklahoma City metropolitan area. Same-day service available in most locations.

(405) 247-0336 Book Free Estimate